Renovation of existing cellar, 1st and 2nd floor with plumbing work:replace kitchen and bathroom fixtures; new 2-pc restroom, replace slop sink, washer and dryer in cellar; no chan…
Renovation of existing basement, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in base…
Renovation of existing 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new boilers and hot water heaters in 1st floor; no change in use, egress or occ…
Renovation of existing cellar, basement, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures on each floor; new 2-pc restroom, washer, dryer, boilers and h…
Plumbing work on cel, 1st & 2nd floor. no change in use group, egress and occupancy. (total: existing two family dwelling units under co#124565/1949.)
Relocate (1) stove and (1) sink at 1st floor, 2nd floor and 3rd floor. No change in use, occupancy or egress.
Plumbing work for the existing two-family house at cellar. no change of use, egress or occupancy.
Remedy ecb violation# 39174650p, 39174660z. remove illegal plumbing fixtures at cellar only. no change in use egress or occupancy under this application.
Boiler work at cel as per plan filed herewith. no change in use, egress or occupancy.
Plumbing and boiler work at cel as per plan filed herewith. no change in use, egress or occupancy.
Plumbing work in conjunction with job #S01282374-I1.
Plumbing work in conjunction with job #B01372907-I1. To remedy ECB violations #39178339K, #39178340H, #39178341J, #39178342L and #39178338Z. No change in use occupancy or egress.
Renovation of existing cellar, first and second floor with plumbing work:relocate kitchen and bathroom fixtures; new combi. boilers in 1st and 2nd floor; install new 3-pc bathroom…
Plumbing work in conjunction with general construction work as per plan to remove ecb violation # 34452801z, 35465957y 35720468z & 35681376m. no change in use, egress or occupancy
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 3-pc bathroom, washer,dryer, boilers and hot water heaters in cellar…
Interior renovation of existing 2 family house for plumbing fixture with associated pipes work.
Renovation of existing cellar, basement, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom,washer, dryer, boilers and hot water heater…
Plumbing work of existing commercial space at 001 as per plan filed herewith. no change in use, egress or occupancy.
Renovation of existing cellar, 1st, 2nd and 3rd floor with plumbing work:relocate kitchen and bathroom fixtures on each floor; new 2-pc restroom,washer, elec. dryer, and elec. hot…