Install replacement hot water heaters and connect to existing gas piping as per plans. no change to use, occupancy or egress.
Plumbing work as shown on plans
Existing burners are being removed & replaced on two (2) existing dual fuel 125 hp boilers. disconnect & reconnect existing gas piping to new burners.
New high pressure gas service, meter & reducing station. no change in means of egress use group or occupancy.
Install(1) new boiler and combination gas/oil burner. con ed steam conversion. (2) new 330 gallon oil tanks. no change in means of egress use group or occupancy.
File pl worktype in conjunction with job#
Replace condensing hot water heater and connect to existing gas piping as per plans. no change in use, occupancy or egress.
Replace gas/oil burner as per plans and connect back to existing gas piping. filed in conjunction with laa# m01321391-i1. no change to use, occupancy or egress.
Install new gas piping for (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Install (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Cap and remove illegal shower, gas dryer. install back 2pc bathroom. remedy ecb violations 39169157p;35677005l;35677006n;35665964z;35665963r. no change of use, egress and occupancy…
Plumbing work in conjunction with interior renvation of existing apt#2l at 2nd floor. no change of use, egress and occupancy.