Convenience opening between 711 and 713 Brighton Beach Avenue. The 711 side opening is filed under application # B01353388-I1
Convenience opening between 711 and 713 Brighton Beach Avenue. The 711 side opening is filed under application # B01353388-I1
PAA is being filed to remove previously proposed bulkhead work. Bulkhead is no longer being proposed to be created.
PAA is being filed to remove previously proposed bulkhead work. Bulkhead is no longer being proposed to be created.
Create a new shaft for a new material lift in existing commercial space, from first floor to cellar accessory storage area. No change in egress, use or occupancy
Create a new shaft for a new material lift in existing commercial space, from first floor to cellar accessory storage area. No change in egress, use or occupancy
Convenience opening in masonry wall between 711 and 713 Brighton Beach Avenue.
Convenience opening in masonry wall between 711 and 713 Brighton Beach Avenue.
Contruction fence in conjunction with alt # q01317533-i1
Contruction fence in conjunction with alt # q01317533-i1
No work under this application all work performed under applications: B01014765,B00116042,B08025735,B08007449,B00952207,B01299323,B01299310,B00967794,B00904622,B00903800,B00990714,B00990244,B00990238,...
No work under this application all work performed under applications: B01014765,B00116042,B08025735,B08007449,B00952207,B01299323,B01299310,B00967794,B00904622,B00903800,B00990714,B00990244,B00990238,...
Herewith filling interior fit out of food store and add work in mezzanine on first floor. No change in egress, use or occupancy.
New Heating Systems, Ventilation Systems, Air Conditioning Systems and Associated Ducts and Piping to accommodate Arch Plans.
Installation of rooftop HVAC equipment, kitchen exhaust ducts and fans, associated with new supermarket on ground floor. No change in egress, use or occupancy
Temporary construction fence in conjunction with DOB NOW job # B01221752-I1
Installation of rooftop HVAC equipment, kitchen exhaust ducts and fans, associated with new supermarket on ground floor. No change in egress, use or occupancy
New Heating Systems, Ventilation Systems, Air Conditioning Systems and Associated Ducts and Piping to accommodate Arch Plans.
Herewith filling interior fit out of food store and add work in mezzanine on first floor. No change in egress, use or occupancy.
Temporary construction fence in conjunction with DOB NOW job # B01221752-I1