Continental Electrical Constru
Permits (39)
Spr 2019 cbrc: renovation of existing i-2 occupancy spaces in the cardiology department of the 8th floor the existing feinberg/galter pavilion to include mechanical, electrical and plumbing. plumbing...
Self-cert 2019 cbrc: interior alterations to existing 27th and 28th floor office space to include the removal of an internal connecting stair. no change to existing use. structural peer review include...
Selfcert 2019 cbrc: interior alterations to existing 19th & 20th floor office space to include the removal of a convenience stair between floors 19 & 20. scope also to include demolition of associated...
Electrical maintenance permit. occupancy: institutional. start date: 3/30/2026. end date: 12/25/2026. all work under this permit must be performed by employees of the listed electrical contractor. the...
For permit b200432264: replacement electrical contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Electrical maintenance permit. occupancy: business. start date: 3/30/2026. end date: 12/25/2026. all work under this permit must be performed by employees of the listed electrical contractor. the elec...
Electrical maintenance permit. occupancy: institutional. start date: 3/30/2026. end date: 12/25/2026. all work under this permit must be performed by employees of the listed electrical contractor. the...
Electrical maintenance permit. occupancy: business. start date: 3/30/2026. end date: 12/25/2026. all work under this permit must be performed by employees of the listed electrical contractor. the elec...
Electrical maintenance permit. occupancy: business. start date: 3/27/2026. end date: 12/22/2026. all work under this permit must be performed by employees of the listed electrical contractor. the elec...
Electrical maintenance permit. occupancy: institutional. start date: 3/30/2026. end date: 12/25/2026. all work under this permit must be performed by employees of the listed electrical contractor. the...
Self cert 2019 cbrc: interior alterations to floors 27, 28, and 29. work to include demo, architectural updates, electrical, mechanical, and plumbing as per plans. 1a construction, b-business occupanc...
Electrical maintenance permit. occupancy: business. start date: 3/27/2026. end date: 12/22/2026. all work under this permit must be performed by employees of the listed electrical contractor. the elec...
Electrical maintenance permit. occupancy: business. start date: 3/27/2026. end date: 12/22/2026. all work under this permit must be performed by employees of the listed electrical contractor. the elec...
Electrical maintenance permit. occupancy: business. start date: 3/27/2026. end date: 12/22/2026. all work under this permit must be performed by employees of the listed electrical contractor. the elec...
Electrical maintenance permit. occupancy: business. start date: 3/25/2026. end date: 12/20/2026. all work under this permit must be performed by employees of the listed electrical contractor. the elec...
Spr. 2019 cbc: full building permit for adjacent parking to existing manufacturing for 76 exterior surface spaces .(occupancy group f-1, type iib construction)
Electrical maintenance permit. occupancy: business. start date: 3/25/2026. end date: 12/20/2026. all work under this permit must be performed by employees of the listed electrical contractor. the elec...
Electrical maintenance permit. occupancy: business. start date: 3/25/2026. end date: 12/20/2026. all work under this permit must be performed by employees of the listed electrical contractor. the elec...
Self-cert 209 cbrc: interior demolition to existing kitchen and mezzanine at floor 20. scope includes demolition of plumbing lines and drains that penetrate the level 20 slab, electrical equipment, ki...
Dds 2019 cbrc: interior alterations to levels b2, b1, l1, and l2 for building shared amenity space. work to include select demolition, construction of new non-load bearing partitions, doors and hardwa...