No public phone or license recorded on recent permits for this contractor. Permit history is listed below.
Non-structural water damage rehab (fixtures and finishes only) at main floor of sfd, including kitchen and bathroom, to return to pre-damage conditions - no changes in layout or ro…
Remodel 2nd level bathroom. window must have tempered glass. (jjl) building code: 2020 mnsbc/2018 irc energy code: minnesota rules chapter 1322 separate permits are required for el…
Basement remodel to add new one bathroom and one bedroom in existing single family house. aaj (project dox plans). - install new partition walls with treated bottom plates and dryw…