Proposed interior renovation as per plan. new kitchen,new baths, new floors and finishes, interior stair removal. no change in use, egress and occupancy
Storefront renovation; work to include removal and installation of interior partitions, door,s and replacement of exterior storefront.no change to occupancy use or egress.
Air cooled vrf heat pump condenser unit, vrf heat pump indoor evaporator, refrigerant, and condensate piping, toilet exhaust system5. control systems.
General Construction work associated with the renovation of an existing single family townhome including reconfiguration of partitions and plumbing fixtures, reconstruction of exis…
Interior renovation of approx. 7,968 sf apartment on the cellar, 1st floor,and second floor. there is no change in occupancy, use, or egress
Interior renovation of existing single family residence. new partitions, fixtures, and finishes per plans.
Structural work associated with the renovation of an existing single family townhome including reconfiguration of partitions and plumbing fixtures, reconstruction of existing bulkh…
Proposed combination of two adjacent dwelling units including the removal of one kitchen, the modification of the remaining kitchen,the renovation of two bathrooms, and misc. parti…
Proposed non-structural modification of unit 12E including removal and replacement of the kitchen, modification of 2 bathrooms, and modification of finishes throughout. No change i…
Installation of a temporary wood fence 12 feet high; on the sidewalk, as per plans
Interior modification of unit 25a including the modification of the kitchen, bathrooms, and finishes throughout. no change in use occupancy or egress is proposed in this applicatio…