Provide and install high pressure gas pipe up to 50' feet of 3/4" - Provide and install all Connections and fittings from Main Meter to Generator Regulator
Drain, disconnect and remove existing water heater; take off site and recycle to extent possible - Provide and install new A.O. Smith power vented water heater - (GPVL50)
Install Package includes: - Provide and install a Carrier Single Stage 97% Furnace - 59SC6A060M17
Add 2 supplies and 1 return air to lower level finish
Provide and install a Carrier Comfort Series Single Stage Furnace - 59SC6A060M14 same for same.
- Drain, disconnect and remove existing water heater; take off site and recycle to extent possible - Provide and install new A.O. Smith 50 Gallon power vented water heater - (GPVL5…
- Provide and install high pressure gas pipe up to 50 feet with 3/4" gas piping - Provide and install all Connections and fittings from Main Meter to Generator Regulator - Erickson…