Modifications to the existing plumbing system on the 8th floor (Infrastructure) as per plans. No change to use, egress or occupancy.
Installation of non-residential cooking equipment at ground floor restaurant including new gas piping.
Installation of new sprinkler line for laundry room. installation of new gas connection for dryers. remediation of ecb summons numbers:39027104h and 39027099m. no change in egress…
Install 5 new plumbing fixtures ( 2 wc, 2 lav, 1 sink)
Modifications to an existing sprinkler/standpipe system.
Plumbing & sprinkler work as per plans
AT 37th FLOOR TENANT SPACE, relocation and addition of sprinkler heads and related piping as per plans filed herewith. No change to use, occupancy, or egress.
Modifications to an existing standpipe system to include installation of new fire pump servicing 100 West Street.
filing sprinkler application