Site plumbing connections for new building. PAA # 1 description in comments
Plumbing work in conjunction with the removal of boilers under application B01322968-I1 and the installation of new boilers under applications B01322981-I1 and B01322994-I1.
work includes installation of hose bibs, sinks, piping, mop sink, hot water heater and backflow preventer.
2A Elev.: Sprinkler and plumbing modification to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
Removal of sink in classrooms.
Provide new lavatory & associated accessories & sanitary & vent & cold water & hot water piping & shutoff valves. Reconnect new plumbing to the existing.
Filing mechanical work to the existing building as per plan filed herewith. No change to use, egress, and occupancy.
1A Elev.: Sprinkler and plumbing modification to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
Modification of existing storm line as shown on plans
Modification of existing plumbing system in the existing storage building as per plan filed herewith. No change in use, egress, and occupancy.
Saint john villa: subsequent civil plumbing work type for phase ii site preparation of a new school complex. job filed in conjuction s01144839, s01149913, 500877063
Replace existing roof drains
PL: Provide New Storm Drainage System. Provide New Main water / sanitary lines for the new building.
P.S. 244-Q: Replace gas fired water heater with heat pump water heater. Gas kitchen equipment will be replaced with electric type. Remove all gas piping and gas meter assembly. CON…
PS244-Q: One sprinkler will be removed and relocated as to be out of future electrical room.
Alteration for the plumbing work related to the replacement of 2 drinking fountains, one new drinking fountain. there is no change in use or occupancy under this application.