Adding nat gas as primary fuel to existing boiler equipment. no change in means of egress, use group, or occupancy.
Herewith filing plumbing work as per plans. no change in use, egress or occupancy
Remove existing and installing new gas service piping.
Replmt (1) new low pressure boiler replmt (1) new comb. gas/oil burner. straight gas only at this time. in conjunction with boiler burner filing #400503095 & 420506401 signed off.…
Installation of new sprinkler heads filed in conjunction with Q01321128-S1 as per plans filed herewith.
General plumbing modification for gas distribution as per plans filed herewith. No change to use, bulk, egress, or occupancy is proposed.
Filing Plumbing work to for a new natural gas service to transition boiler plant from fuel oil to dual-fuel.
Related plumbing work for new fuel cell generating system at 1st floor. Related Alt I #220742926 approved by DOB accordingly.
Installation of booster pump, express riser, and assosiated piping as shown on plans