Installation of plumbing fixtures on the sixteen floor. no change to use egress or occupancy.
Installation of plumbing fixtures on the 15th floor as per plans filed. no change to use, egress or occupancy.
removal of interior plumbing and sprinkler fixtures/piping with temp loop installed on 40th floor
Modification to Plumbing and Sprinkler Systems as per plans filed herewith.
Plumbing modifications as per plans filed herewith. no change in use, egress or occupancy
Plumbing modifications taking place on the 27th fl Con/28th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
Removal of existing plumbing fixtures and associated piping on the 39th floor (LL Demo) as per plans. No change to use, egress or occupancy.
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Filing herewith plumbing work to existing 7th floor space. No change in use, egress or occupancy.