Replace: 7lavs,7wc&2urinals on existing roughing on floors 7,10,11&12. new: install 1 wc, 1 lav , 1 hwh non gas, 1 water piping & 1 sanitary piping on floors 7,10,11&12.
Remove 1 sink, 2 dishwashers, 1 hwh non gas, water piping & sanitary piping and cap lines at source as shown on drawings filed herewith. no change to use, egress or occupancy.
Modification of sprinkler, standpipe and plumbing systems on 4th floor
Plumbing work as shown on plans filed herewith for BPCA space. No change to use, egress or occupancy.
Plumbing work as shown on plans filed herewith for PMO & Common Corridor . No change to use, egress or occupancy.
Herewith filing plumbing work as per plans. no change in use, egress or occupancy
Plumbing modifications as per plans filed herewith. no change to use egress or occupancy.
Plumbing work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.