No public phone or license recorded on recent permits for this contractor. Permit history is listed below.
Addition and/or Alteration - Replace 4 baseboard electrical heaters NO WIRING
Addition and/or Alteration - 200 Amp new Panel and service
Addition and/or Alteration - Service Panel and Breaker box changed to a 200 amp 3 phase service.
Addition and/or Alteration - Rewire with new light fixtures, receptacles, and switches. New 100 AMP Panel and Service
Addition and/or Alteration - Install 200 amp service & panel , rewiring, new lights, receptacles, switches, electric hot water tank, electric dryer
Addition and/or Alteration - Rewiring lights, switches, receptacles. New 200 amp service. New Breaker Panel .
Addition and/or Alteration - New 200 amp service and panel. rewiring, lights, receptacles, switches
Addition and/or Alteration - Replace 100 Amp panel and new service, rewire with new light fixtures, receptacles, switches
Addition and/or Alteration - Rewire with new light fixtures, receptacles, switches, and a 200 amp new panel and service
New Construction - Electrical Permit for combo RP-2025-003585
Addition and/or Alteration - Install new 200 amp panel and rewire as per APPROVED plans-2017 NEC.
Addition and/or Alteration - Rewire with new light fixtures, receptacles, switches, install new 200 amp panel and service
Addition and/or Alteration - Partial wiring, replace light fixtures, receptacles, switches
Addition and/or Alteration - Electrical Permit for combo RP-2025-012037
Addition and/or Alteration - 100 amp new panel and service, rewire with new light fixtures, receptacles, and switches.
Addition and/or Alteration - Rewire with new light fixtures, receptacles, switches, and replace new 200 AMP panel and new service