construction fence to protect site during entire project
Removal of sidewalk, curbs, asphalt pavement, utilities and site preparation. Excavation and installation of sewers and utilities and curbing, sidewalk, and asphalt pavement.
Providing exhaust air in the underground electrical vault, interlocked with the light switch, to purge 6 air changes per hour (ACH) upon entry to the vault. Dehumidification and he…
Contractor to install six (6) below grade reinforced cast-place and precast structures. Scope includes excavation and backfill, placing steel reinforcement, placing and curing cast…
Filing to install six (6) below grade reinforced cast-place and precast structures. Scope includes excavation and backfill, placing steel reinforcement, placing and curing cast-in-…