Install new gas piping and gas meter for replacement gas/oil burner on existing boiler as per plans. no change in use, egress or occupancy.
The scope of work consists of installing new: gas meter, gas lines for cooking kitchen, valves, water lines, grease interceptor and sink.
Install new sink, tub, lav, toilet and sprinkler heads in conjunction with Alteration type 1.
Application filed in conjunction with plumbing application # X00794982 to address violations: 39064235K, 39064237Y, 39064232P , legalize the construction work to split apartment in…
Plumbing work in conjunction with Alteration 1 application # X00794920.