QT - remodel to convert part of training room into (4) office and convert part of open office into (2) small conference rooms at existing office - OVA
Rebuild 200A OH service that was brought down during a storm.
Service rebuild upgrading to 200A from 150A MCB.
Mechanical Electrical and plumbing infrastructure replacement of existing equipment that has passed its service life. Work to be performed in Electrical and Mechanical rooms across…
EM repair of 2.5 C for 225A panel feeders that faulted. Pulled new conductors and cut in pull points.
Exterior installation of EV Charger its concrete pad and new electrical service.
Electrical connection to existing water quality control pond pump at Krieg Field (City of Austin Parks and Recreation). Install approximately 345 linear feet of electrical conduit…
Demolition of interior cmu walls hvac metal roof panel and aluminum storefront. New interior cmu wall hvac roof insulation TPO roof and aluminum storefront.
ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel of Art Classrooms in Main Academic Building and Associated Mechanical Repairs t
ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Addition and Remodel to Austin High School. Phase 3. (396761 SF).
ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel to Austin High School. Roof Recovering at Theater Building. (396761 SF).
ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Interior Remodel to Austin High School. Phase 2. (396761 SF).
Replacement of a failing 350A breaker serving HVAC equipment. No other equipment including the chiller that the breaker serves are being replaced.
HVAC installation for existing warehouse.