New pool (autofill/heat)
Primary bathroom is to be remodeled w/scope of work to include large shower moving toilet over to accommodate required code clearances and plumbing fo
Remove 0ld disconnect federal pacific and install new only replacing the panel no meter work will be done just trying to bring to code. 8 disconnects
remove and replace existing disconnects per insurance say these are fire hazards federal pacific panels Only replacing the panel no meter work will b
Remove 0ld disconnect federal pacific and install new only replacing the panel no meter work will be done just trying to bring to code. 16 disconnect
Remove 0ld disconnect federal pacific and install new only replacing the panel no meter work will be done just trying to bring to code. 8 disconnec
remove existing old disconnect and replace with new due to fire hazard per insurance company federal pacific panels **Only replacing the panel no met
Remove 0ld disconnect federal pacific and install new only replacing the panel no meter work will be done just trying to bring to code. 12 disconnect
remove existing disconnects and replace with new due to fire hazard per insurance these are federal pacific panels Only replacing the panel no meter
Remove 0ld disconnect federal pacific and install new only replacing the panel no meter work will be done just trying to bring to code. 12 disconnects
remove existing disconnects and replace with new due to fire hazard per insurance these are federal pacific panels **Only replacing the panel no mete