Emergency work: installation of supported scaffold in b3 level area to reach ceiling and remove falling ceiling panels as shown in drawings. no change in use, egress or occupancy.
Installation of supported scaffold as shown on drawings. no change in use egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Installation of engineered enclosure around scaffold at 4th floor roof, ohp on ground & roof protection on glass awning at ground level. no chnage in use, egress or occupacny. we s…
Installation of supported scaffold stair tower as shown on drawings. no change in use egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Installation of supported scaffold as shown on drawings. no change in use egress or occupancy. we shall comply with chapter 33 of 2022 b,c
Engineered enclosure system installation as shown on drawings. no change in use egress or occpancy. we shall comply with chapter 33 of 2022bc
Installation of supported scaffold in lobby area to reach ceiling as shown in drawings. no change in use, egress or occupancy.