Installation of suspended scaffolds to conduct inspections for the LL 11 Cycle 10 report
Garage repairs as per plans filed herewith. includes repairs to correct ecb violation 35084363h. no change in use, egress or occupancy
Installation of suspended scaffolds for inspection of facades
Installation of suspended scaffold to perform facade inspections
Installation of suspended scaffold for facade work or inspection.
Structural work including removal of existing terracotta masonry at exterior wall to create new louver wall openings at floors 2-4, 8-9 and 15(C)/16(M). No change in use, egress, o…
Exterior restoration as per plans filed herewith, No change to use, egress or occupany