New two-story two-family building, obtain a new c/o.
Herewith filing for house of worship (ug#iii) with acessory facilities as per plans.
Full demolition of existing 2 story frame detached building.
Installation of support of excavation and foundation work as per the plans filed herewith. no change in use, occupancy or egress.
Temporary construction fence work in conjunction with dob now general construction application #q00909669.
Herewith filing for requisite temporary construction fence as per submitted plans.
Fully demolition of existing 2 1/2 story frame house
Hand demolition of existing one story garage
Install 8' temporary construction fence at the above address
New 5 story building for house of worship.
Interior renovation of existing store involve general constructin work to cure ecb violation#35669620n. no change in use, occupancy or egress.
Install temp. construction fence in conjunction with nb job #421960471.
Proposed foundation and excavation work types for new extension to establish a 2-story residential building w/ cellar, in conjunction w/ alt-co application q01227749-i1.
Temporary construction fence filed in conjunction with alt1 #421941368 for alteration of 1-family house with 2-story plus cellar addition.
Establish 4 story 10 family residential building w/ cellar. obtain new certificate of occupancy.