Structural support work in conjunction with the interior renovation of existing apartment #5b. . work include,repair required for poor slabs, exterior opening for exhust louvers. s…
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
Limited to interior demolition to existing apt # 5B ON THE 5TH FL. Remove non-bearing partitions & interior finishes, removal of all windows and installation of temporary window pr…
General construction modifications as per plans filed herewith. No change in use, egress or occupancy.
Upgrade hvac system to apartment 5b on the 5th floor . work include install new hvac sytem , piping, duct work hung fan coil units from the ceiling ,louvers and humidifiers , all a…
Perform mechanical work inconjunction with 16th floor apartment renovation. replace existing hvac system. no change to use, egress, occupancy or fire protection.
Interior renovation to existing apt # 5B ON THE 5TH FL. Construct new partitions and finishes. windows to be replace by bothers . No change in use, egress & occupancy
ALT-CO filed to convert multiple dwelling to single family home. New certificate of Occupancy to be obtained
Application filed for Partial demolition means and methods And Temp shoring & stabilization of a 4 story building, in conjunction with ALT-CO filing M01129209-I1.
Soe filed to shoring/bracing for new foundations
Perform minor interior demolition & construction inconjunction with 16th floor apartment renovation. reconfigure bathrooms, kitchen & closets. install new lighting. no change to us…
Interior renovations of apartment 6a, work to include partition work and finishes as per plans filed herewith. no change to use, egress or occupancy.