Relocate radiator in bathroom.
2nd floor bathroom remodel- toilet, sink, shower.
Remove radiator and install hot water toe kick heater. rezone boiler.
Kitchen remodel.
Cap radiator and add new toe kick heater in kitchen on new zone.
kitchen remodel, kitchen sink in same location.
Remove radiator in kitchen and rezone and install new toe kick heater under kitchen sink.
Kitchen remodel. Sink in same location.
2nd floor bathroom remodel
Add zone for new infloor heat in bathroom.
Bathroom remodel- All fixtures in same location.
Basement bathroom remodel- Toilet and shower in same location relocate lav sink.
Relocate laundry sink and washer. Install new emergency floor drain in same location.
Basement bathroom remodel. All fixtures to stay in same locations. New shower drain in same location.
INstall 2 new combi boilers.
2 combi boilers
Main level bathroom remodel
Bathroom remodel all fixtures in same locations. new tub, valve, lav faucet and toilet.
main level bathroom remodel existing locations.