Providing structural framing, which includeswall plates and post-installed anchors into existing concrete elements.structuralframing and connections to support a glass railing arou…
#9000 - Structural modifications in Popmart space. No change to egress, use, or occupancy.
Structural, foundation, earthwork on the cellar and 1st floor as indicated on drawings
Scope of work Removal and installation of exterior storefront. No change to use, egress, or occupancy.
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Mechanical modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy.
Architectural modifications taking place on the 4th and 5th floors as per plans filed herewith. No change in use, egress or occupancy.
Modifications and redistribution of existing mechanical systems. No change in use, egress or occupancy.
#9000 - Lighting and Mechanical modifications in Retail space for Popmart. No change in egress, use, or occupancy.
Structural modifications for new mechanical equipment, canopy, lofts, and bulkhead extensions.
Modification to the existing HVAC system on the 22nd floor (ACP Office) as per plans. No change to use, egress or occupancy.
Fit out of existing office space. No change in use, egress or occupancy.
#9000 - Interior renovations of Retail spaces for PopMart. No change in egress, use, or occupancy on this application.
Demolition of existing vavs, ductwork and piping serving existing space. installation of new variable refrigerant system to servenew space consisting of outside air units for venti…
Relocation of conduit
Existing 13 story brick facade building, change of use from office to residential for floors 4-13 and south envelope modification. all life safety systems to be maintained per code…
Herewith filing for change of use, egress and occupancy for proposed life sciences building. horizontal and vertical enlargements of existing building.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 22nd floor (ACP Office Buildout). No change to use, egress or occupancy.
Mechanical work in conjunction with alt-co #m00895355-i1.