Application filed for interior renovation at the indicated floors herein. no change to use, egress, or occupancy. all trades to be filed separately.
Hereby filing Removal of slab and framing at 17th floor, New convenience stair between the 16th and 17th floors and structural reinforcement for stair as shown on plans filed herew…
Removal and construction of non-bearing partitions, doors, ceilings and finishes, demountable partitions, interconnecting stair as shown on drawings. No change in use, egress or oc…
Hereby filing to construct one story addition converting a single story shell 10th floor to a double story space to be used as gymnasium as shown on plans filed herewith. No change…
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
General Construction to take place on the 14th floor as per plans filed. No change in use, egress, or occupancy.
Sbh med office: modification of hvac equipment and ductwork to accommodate alterations at partial 1st floor withi the existing hospital building as per plans. no change to use, egr…
General Construction to take place on the cellar & 13th floor as per plans filed. No change in use, egress, or occupancy.
General Construction to take place on the 28th, 30th, 31st, 32nd Construction floor as per plans filed. No change in use, egress, or occupancy. (Listed as 29th, 31st, 32nd, 33rd Ma…
Hereby filing reinforcement of the framing for new PA space, new staircase opening and supports.as shown on plans filed herewith. No change to use, occupancy or egress.
Lighting fixtures replacement as per plans filed herewith. No change to use, egress or occupancy.
Mechanical modifications taking place on 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
General construction taking place on 14th floors as per plans filed herewith. no change in use, egress, or occupancy.0
Structural modifications taking place on the 4th and 5th floors as per plans filed herewith. No change in use, egress or occupancy.
Hereby filing demolition of structural slabs for new interconnective stair; addition of new partitions, and finishes as shown on plans filed herewith. No change to use, occupancy o…
Modifications to the existing HVAC system on the 28th Floor (WB), including associated ducts & piping, as per plans. No change to use, egress, or occupancy.
Foundation
General construction modifications related to generator enclosure / noise mitigation screen on the 7th floor roof per plans. no change in use, egress, or occupancy.
At 1st floor tenant space, removal of hvac ductwork, piping, controls, and ac units as per plans filed herewith. no change in use, occupancy or means of egress.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor (Heyman Buildout). No change to use, egress or occupancy.