Filing for the removal, replacement and installation of plumbing fixtures in apt 3fg on 3rd floor. no change to use, egress or occupancy.
Renovation of existing residential unit 11a 350 albany street with new plumbing fixtures as per drawings herewith. no change to use, egress or occupancy.
Replace 1 water closet, 1 shower, 1 washer, 1 kitchen sink. Remove 1 gas range. Install 1 electrical range, 2 lavatories, 1 bathtub, 1 water closet, 1 dishwasher.
Modifications to existing plumbing system in apartment #9mn. no change in use, egress, or occupancy.
Pl fixtures filed in conjunction with dob now gc. no change to use, occupancy or egress.
New alt2 application for general construction work to be performed in existing unit 1C on the bas, 1st, and 2nd floors. Subsequent plumbing application to be filed. All per plans.…
Plumbing work associated with bathroom & kitchen renovations in apt 15ab as per plans filed herewith. general construction work filed under separate dob now application. no change…
Plumbing work in apartment 5s on the 5th floor of an existing residential building. no change to use, occupancy, or egress. new: (1) wc, 1(lav), (1) bar sink, (1) washer, replace:…