Kale Construction Inc
Permits (126)
Renovation of existing apartment #3r in 3rd floor with general construction: new partitions, doors, flooring and cosmetic work; no change in use, egress or occupancy under this application.
Renovation of existing cellar, 1st and 2nd floor with general construction:new partitions, doors, flooring and cosmetic work; no change in use,egress or occupancy under this application.
Subsequent filing for kitchen hood and HVAC system modification in an existing retail space (Suite C06) as per the plans filed herewith. No change in use, egress or occupancy.
Renovation of existing cellar, 1st and 2nd floor with general construction: new partitions, doors, flooring and cosmetic work; replace stair at rear yard. no change in use, egress or occupancy under t...
Interior renovation of existing 2-story building with general construction work as per plans filed herewith. related plumbing work will be filed subsequently. to resolve the complaint#3a45538. no chan...
Remove dob violation # 35685850z; 35685649r; 35685648p; 35685647n; 35685853y. obtain work permit. no change in use group, egress and occupancy. (co#320513486f/2017)
Interior renovation of existing 3 family building on basement, 1st and 2nd floor. Partition work, flooring and ceiling. No change in use, egress and occupancy.
Install new central air condition system at existing 1-story building.
File construction work at proposed deli store to install new partitions and interior finishes as per plan. no change in use, egress or occupancy.
Interior renovation of the existing office on 001 floor as per plan filed herewith .no change in use, egress, or occupancy.
To propose 3pc bathroom at cellar and new bedroom at 002 fl for one-family house with general construction work type as per plan filed herewith. no change of use, egress or certificate of occupancy.
Renovation of existing commercial space in partial first floor with general construction: install new partitions, floor/wall finishes. no change in use, egress or occupancy under this application.
NEW MECHANICAL EXHAUST SYSTEM FOR PROPOSED 3rd FLOOR BEAUTY SALON ATEXISTING COMMERCIAL UNIT. EXISTING USE GROUP 6. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
Resolve 39172975y and 39172976x; remove (3)illegal shed storage at rear yard and restore back to prior legal rear yard. no change in use, egress or occupancy under this application.
Resolve ecb violations: 39179019x and 39179020n; remove illegal enclosed attached wood frame structure as per plan; no change in use, egress or occupancy under this application.
Interior renovation of existing store at 1st floor. no change in use, occupancy or egress
Install new awning with aluminum box at storefront as per plan. no change in use, egress, and occupancy.
Interior renovation of existing apartment#12e on 12th floor, removekitchen non-structural partition wall, update kichen cabinet andbathroom tile floor, install new vinyl floor over original floor as p...
Replace (1) hvac on roof as per plan; no change in use, egress or occupancy under this application.
ALTERATION TO RENOVATE THE EXISTING 3rd FLOOR COMMERCIAL UNIT FOR A BEAUTY SALON BUSINESS. NO CHANGE TO EXISTING USE GROUP 6. NEW, RELOCATION, AND REPLACEMENT OF NEW FIXTURES AND FINISHES. NO CHANGE I...