Installation of new ductwork (~200lf) connected to existing ahu units within the space. installation of new outside air fan and electric air curtain at the entrance as per the draw…
Installation of new ductwork (~200lf) connected to existing ahu units within the space. installation of new outside air fan and electric air curtain at the entrance as per the draw…