Filing herewith for partial demolition inclusive of floor slab cuts. There is no change in use, egress occupancy as part of this application.
Removal of interior finishes on sub cellar and cellar floor vault. There is no change in use, egress occupancy as part of this application.
Minor architectural work on part of the 1st floor. No change to storefront.
Minor mechanical work on part of 1st floor.
Mechanical modifications taking place on the ___6 & 7_ floor as per plans filed herewith. No change in use, egress or occupancy
Exterior lighting upgrade and replacement of associated cladding.
Interior work to include minor non-structural demolition and construction of interior partitions as shown on plans. Work to include lighting upgrades, column covers, and new finish…
Structural framing with steel on 18th and 19th floors. no change in occupancy, use or egress.
Renovation of guestrooms demolition of a limited number of non-load bearing partitions on floors 4-17, revised bathroom layout in the presidential suite on the 12th floor per plans…
Removal and disposal of interior partitions, doors, ceilings and finishes on the 39th floor (LL Demo) as per plans. No change to use, egress or occupancy.
HVAC removals on the 39th floor (LL Demo) as per plans. No change to use, egress or occupancy.
Interior renovation of five story single family building with cellar. Renovation work to include demolition and modification of non-load bearing partitions, finishes, and plumbing…
General construction modifications taking place on the _6,7,8___ floor as per plans filed herewith. No change in use, egress or occupancy
Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress or occupancy.
Filing for removal of existing raised floor, doors, non-bearing partitons, and finishes as part of renovation of existing sprinklered commercial kitchen and workplace cafeteria spa…
Filing for modifications to existing mechanical systems as per plans filed herewith. No change in use, egress, or occupancy.
Remove existing ductwork and refurbish existing ac units as part of upgrade of existing hvac and kitchen exhaust system at 5th floor cafe servery area as per plans filed herewith.…
Proposed temporary construction field office per plans filed herewith. no change in use, egress or occupancy.
Modifications to existing mechanical systems and associated ducts and piping as per plans filed herewith. no change in use, egress, or occupancy.