Structural work in relation to the rear addition in conjunction with the ot #Q00972805-I1 . FO filed under separate application.
Foundation work in relation to the rear addition/ Structural work in conjunction with the at #Q00972805-I1. ST filed under separate # application #Q01030069-I1.
conversion from 1 to 2 family - rear addition-all work as per plans submitted.
Interior renovation in apt 10i filed in conjunction with dob now pl. no change to use, occupancy or egress.
Propose excavation, including soldier piles, bracing and stable slopes as per plan, in conjunction with GC # B01224916-I1
Propose mechanical system as per plan filed in conjunction with Alt-CO-GC # B01224916-I1. Design includes the installation of heating and cooling systems, building exhaust systems,…
Propose foundation system, composed of spread footings and mats with strap beams and concrete foundation walls. Cast-in-place columns shall be poured monoloithically with FO walls,…
Propose partial demolition and Structural work for expansion of 2-story building to a 5-story concrete residential building as per plan, in conjunction with GC # B01224916-I1