Partial facade masonry removal
Mechanical work in conjunction with NB M08022114-I1
Mechanical work in conjunction with NB M08022114-I1
Demolition of all existing equipment, duct work and risers
Demolition of all existing equipment, duct work and risers
Interior demolition including removal of all non-structural interior partitions, furring and finishes.
Interior demolition including removal of all non-structural interior partitions, furring and finishes.
New Mechanical Systems including HVAC System for 5 - Story NB with Industrial Use.
Mechanical work in conjunction with NB # M00637209.
Mechanical work in conjunction with NB # M00637209.
New Mechanical Systems including HVAC System for 5 - Story NB with Industrial Use.
Filing to erect a 25 story mixed use building. Affordable housing. Consultation meeting accepted on 10/27/2022
Filing to erect a 25 story mixed use building. Affordable housing. Consultation meeting accepted on 10/27/2022
The proposed project is a new industrial use high-rise building located at 28 90 Review Avenue The overall building will be six stories and approximately 158-feet in height.
The proposed project is a new industrial use high-rise building located at 28 90 Review Avenue The overall building will be six stories and approximately 158-feet in height.
Foundation work filed in conjunction with NB M08022114-I1
Structural work in conjunction with NB M08022114-I1
Foundation work filed in conjunction with NB M08022114-I1
Structural work in conjunction with NB M08022114-I1
Mechanical work in 6th floor mechanical room.