Install of solar panels
Installing existing panels (8.75 kW DC) from a previous installation on the rooftop of the existing residential home. In addition installing a new 11.5 kW AC inverter integrated wi…
Request to disconnect 200A main breaker to install new 200A transfer switch for energy storage installation. No meter can replacment required.
Install a new 3.05 kW rooftop solar and an 11.5 kW energy storage system to the existing residential only.
Request to Disconnect the 125A main breaker to install a new 200-amp transfer switch for energy storage installation. Service upgrade to 200a
Request for disconnect for new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required. ESS installa
Electrical temporary disconnect required for solar energy system install. No changes to structure proposed.
Request for disconnect for new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required. ESS installation. Utility is BBEC
Electrical temporary disconnect required for solar energy system install. No changes to structure proposed. EP Added and AUX removed as this is BlueBonnet electrical service