Interior renovation of 8th floor apartment unit 8ab. related non-load-bearing partition changes. no change in use, occupancy, or means of egress.
Installation of temp construction fence in conjunction with alt-1 filing. no change in use, egress or occupancy.
Mechanical modifications to include HVAC replacement and replacement of associated ductwork. No change of use, occupancy or egress.
Filing herewith mechanical work for the building at the address listed. includes new vrf system, and kitchen, toilet & laundry exhaust systems. natural ventilation provided, refer…
Interior renovation of exisiting apartment including the removal & installation of non-load bearing partitions, new wall finishes, & kitchen cabinets as indicated on the drawings f…
Propose to remove interior partitions, doors, and ceilings as shown on drawings
Interior renovation of an existing class a apartment including new flooring, cabinetry, fixtures, doors, dropped ceiling, and partitions as per plans filed herewith. no change in u…