Modifications to the existing Mechanical Systems equipment and related duct work on the 10th and 11th floors as per plans submitted herewith. No Change to Use, Occupancy Group, or…
Mechanical modifications taking place on the 33rd floor (36th floor Construction) as indicated on the drawings.
Mechanical modifications taking place on the 6th floor (8th floor Marketing) as indicated on the drawings.
Replacement of existing chiller and chiller pumps on technical (mechanical) roof, work to include the split systems to serve Server room on 6th floor as per plans filed herewith. N…
Mechanical system work as per the plans filed herewith. no change to use, egress or occupancy.
Herewith file mechanical plans to replace existing a/c unit of interior floors of the building with a new water cooled unit of the same capacity, work on 7th floor. (unit is 35 ton…
Installation of a 5 ton, water cooled, Climatemaster A/C unit with a single line supply air duct layout, ceiling return air grilles, and condenser water supply & return piping and…
Complete upgrade of HVAC system.
the installation of a 4 ton Mitsubishi City Multi split AC system (ACC1 outdoor unit connected to all 3 indoor units)
Filing for mechanical work at the 1st floor. No change to use, egress, or occupancy.
Removal and installation of ductwork, diffusers, fans, ac units and related mechanical piping. no change in use, egress or occupancy.
Mechanical work for ING Financial on 10th and 11th floor