Mechanical filing design includes the removal and replacement of an exisitng five ton water source heat pump for the space heating of the commercial space. no change in use, egress…
Installation and modification of mechanical HVAC systems, including rooftop HVAC equipment, interior ductwork, piping, dampers, controls, sensors, and associated appurtenances serv…
Installation and modification of mechanical HVAC systems, including rooftop HVAC equipment, interior ductwork, piping, dampers, controls, sensors, and associated appurtenances serv…
Replace existing water cooled ac with air cooled split system in the 24th floor it room. no change in use, egress, or occupancy under this filing.
Replace existing water cooled ac with air cooled split system in the 24th floor it room. no change in use, egress, or occupancy under this filing.