Installation of mechanical systems for restaurant fit-out, including rooftop and interior equipment, exhaust systems, five type 1 hoods, grease ducts, piping, and ductwork - related to bda-2025-09958
Installation of new split systems as part of construction of a temporary enclosed pedestrian walkway with storage to connect existing hospital to trailer used for sterile processing.
Alteration to the existing mechanical system to install a new split system and ductwork.
Add (1) vav box, atds, and associated ductwork in training room
Replacement of exhayst system ductwork
Installation of type 1 cooking hoods, grease ducts, indoor mua and pollution control units, cooking appliances and gas piping for new restaurant- related to bda-2024-06312
Interior renovation including changing existing office space into new classroom(s).
Alteration to the existing mechanical system to replace equipment. related to bda-2025-09915. work includes new interior and exterior equipment and ductwork.
Replace rooftop units 1,2,4,5 at same locations.
Ductwork and hydronic piping for starbucks fit out
Modifications to ductwork with new vavs and fcus as part of interior alterations to the sterile processing department locker room and adjacent areas on level 02
10,400 sf tenant fit-out on the 2nd floor of existing 6-story building.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com