Interior renoivations for the linacs r441 & r443 equipment replacement on the 4th floor. no change in occupancy, use or egress..
Modifications to exsiting mechanical ductwork and piping to support linac r441 & r443 equipment upgrades on the 4th floor. no change in ocupancy, use or egress.
Alteration of existing Workroom/Dry lab to a new Shared Tissue Culture Lab on the 4th floor room RL-430. New equipment, patching & repairing of existing surfaces, new flooring & wa…
Mechanical work on the 4th floor. No change in occupancy, use or egress.
Mechanical work on the 4th floor. No change in occupancy, use or egress.
Alteration of existing Workroom/Dry lab to a new Shared Tissue Culture Lab on the 4th floor room RL-430. New equipment, patching & repairing of existing surfaces, new flooring & wa…
Mechanical work on the 12th floor as per plans. No change in occupancy, use or egress.
Proposed equipment replacement of existing Autoclave located on the 12th fl room RL-1202 Soiled Utility (Dirty Cage Wash). Patching and repairing of existing finishes as required.…
Proposed equipment replacement of existing Autoclave located on the 12th fl room RL-1202 Soiled Utility (Dirty Cage Wash). Patching and repairing of existing finishes as required.…
Mechanical work on the 12th floor as per plans. No change in occupancy, use or egress.