Relocate existing 1-story 1 bedroom 1 bathroom dwelling unit on property to a new location within the property.
install gas pressure* regulator for elevated pressure.
Replace an existing natural gas Option generator Automatic Transfer Switch Docking Station onto the on existing equipment pad. Change out Service Disconnect Fuse. Site plan exempti…
Change out 120KW natural gas generator Docking Station Service Disconnect Fuse and add generator pad extension for existing FS