Modifications to the existing Sprinkler System: Remove (54) existing Sprinkler heads and install (69) new sprinkler heads and associated piping on the 1st Floor as per plans (Harbo…
Remove (172) heads, Relocate (2) heads, Install (268) new heads and (6) temporary heads on the 10th Floor; Remove (6) heads and Relocate (9) heads on the 13th Floor as per plans (H…
Sprinkler modifications taking place on the _6 & 7___ floor as per plans filed herewith. No change in use, egress or occupancy
Modification of existing sprinkler system on 27th floor office space as per plans. no change to use, egress or occupancy.
Ansonia endoscopy asc reno - sprinkler modifications as per plans filed herewith. no change to use, egress or occupancy.
Standpipe filing as per plans, no change in use, egress or occupancy.
Installation and removal of Sprinkler fixtures along with related piping.
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
Removal of existing sprinkler and installation of temporary sprinkler loop on 20th floor as per drawings. no change to use, egress or occupancy.