Renovation of existing apartment at tenth floor level of 900 fifth avenue, as per attached plans. no change in occupancy, use, egress, floor area, volume or fire safety.
Interior renovation to install new air conditioning systems for the residence and to revise the existing steam radiators. No change to egress, occupancy, or use.
Interior alterations to Apt. 11C, as per plans. No change to Use, Occupancy, or Egress.