No public phone or license recorded on recent permits for this contractor. Permit history is listed below.
Pull and replace 10 lavs/faucets - 12th floor
Relocate diffusers and install sound boots for 3 shared offices. Also installing burglar bars in supply duct mains for HP 2 and HP 3.
HVAC alterations reusing the existing distribution system through the current air handling unit, reusing existing and adding new heat pump units to suit the new floor layout, GRDs,…
Rework existing ductwork to accommodate new floor plan. 5 new RA transfers per approved plan.
Remove and cap plumbing as needed. Install water and drain for ice machine.
" Mitigation exhaust fan#3 shall be activated by a refrigerant detection/sensor inside space." HVAC system, installing new split dehumidification system for pool, cold plunge pool…
Installation of additional fixtures. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe fittings, traps,…
Adjust existing duct system to accommodate new floor layout. Replace all troffer style GRD's to meet building standard for GRD's suite 950
Adding transfer air egg crates and new diffusers. Re-routing some existing ducts.
Adding just one supply diffuser and associated ductwork per approved plan.
Replace two existing fan coil unit like-for- like
Install Water with Beverage Backflow for Appliance.
Extend ductwork into new rooms and add new GRD's as required. Balance impacted zones. 6th floor work affected; open offices 617, office rooms; 619A, 619, 620, 621, production room…
Furnace and Heat Pump Replacement.
Shuffle existing diffusers as required to accommodate new layout and balance impacted zones per approved plan.
Emergency replacement of a one-ton heat pump.
Adding 3 breakroom sinks and 3 water heaters
BLDG1169747
Rework existing office ductwork to feed the new office conference room. remove 2 existing abandon vav boxes and relocated t stat for vav l-10-22 bldg1170621
HVAC alterations for floors 32-34, include modifying the existing distribution system through the current air handling units, reusing existing and adding new fan-powered and VAV bo…