Remove existing partitions, toilet fixtures kitchen equipment and cap piping, remove damaged ceilings, floors, and remove debris
Mechanical modifications taking place on 20th floor as per plans filed herewith. no change in use, egress, or occupancy.
Filing for interior alteration for tenant fitout as per plans no to change use egress or occupancy
Herewith filing for modifications to the existing mechanical system on the roof as per plans. no change to use, occupancy or egress under this application.
Filing herewith drawings indicating modification of the Mechanical system on the 22nd floor construction (marketed as the 23rd floor). No change in use, egress, or occupancy under…
General construction taking place on 20th floor as per plans filed herewith. no change in use, egress, or occupancy.
Filing herewith drawings indicating interior renovations on the 17th floor construction (marketed as the 18th floor). No change in use, egress, or occupancy under this application.
Filing herewith drawings indicating modification of the Mechanical system on the 17th floor construction (marketed as the 18th floor). No change in use, egress, or occupancy under…
Filing herewith drawings indicating modification of the Mechanical system on the 21st floor construction (marketed as the 22nd floor). No change in use, egress, or occupancy under…
Installation of new structural steel members due to the removal of the convenience stair between the 5th and 6th floors, and add new slab fill at the 5th and 6th floors as per plan…
Filing herewith drawings indicating interior renovations on the 22nd floor construction (marketed as the 23rd floor). No change in use, egress, or occupancy under this application.
Filing herewith drawings indicating interior renovations on the 21st floor construction (marketed as the 22nd floor). No change in use, egress, or occupancy under this application.
Removal of existing convenience stair between the 5th and 6th floors, removal of associated walls and platform, and add new slab infill at the 6th floor as per plans. NO CHANGE IN…
Herewith filing for minor demo removal of air handlers and install new air handlers and air-cooled condensers as per the drawings filed. No change in use, egress or occupancy.
Herewith filing for minor demo and interior renovation on the 4th floor as per the drawings. No change in use, egress or occupancy.
Pre-tenant work-- mechanical modifications in conjunction with demo and bathroom fitout.
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
Minor interior renovation of suite 909. no change to use, occupancy or egress.