QT - Retaining wall for bio filtration. Approved site plan but walls exceeds 4 ft so BP was suggested by staff. - OVA
Application 3. This permit is only for the finish out of the elevator lobby and the building corridor.
Application 1. First generation interior tenant office space. Includes typical private offices open office workstations conference rooms. Breakroom is
Application 2. First generation interior tenant office space. Includes typical private offices open office workstations conference rooms. Breakroom is
ePlan: Commercial Expedited Review - First Time Finish-Out for Admin Office Floor 15 Suite 1510 (3675 SF)
ePlan: Commercial Expedited Review - First Time Finish-Out for Admin Office Floor 15 Suite 1511 (4302 SF)
ePlan: Commercial Expedited Review - First Time Finish-Out for Admin Office Floor 15 Suite 1512 (5764 SF)
ePlan: Commercial Expedited Review - First Time Finish-Out for 15th Floor Common Area (1377 SF).
ePlan: Commercial Expedited Review - First Time Finish-Out of Elevator Lobby Area (260 SF).
First time finish out of an existing tenant space in shell building. No change of use. No access control.
First time finish out of an existing tenant corridor in shell building. No change of use. No access control.
First time finish out of an existing tenant space in shell building. No change of use. No access control. (Suite 400)
7 day - tenant finish out to create office space - expansion - no access control - different scope of work than 2025-153249 pr - ova
This is a maintenance project removing the existing chilled water piping and replacing it with new piping in the same locations in preparation for an