Refiling of job number 421414605 for connection of gas piping to high pressure gas boiler in order to obtain inspection and signoff.
Connect to existing gas piping for replacement rooftop package hvac unit as per plans. no change in use, egress or occupancy.
Gas reconnections for seven (7) replacement split hvac furnace units.
Connect to existing gas piping for one (1) replacement gas-fired furnace to serve the 1st floor system as per plans. no change in use, egress or occupancy.
Connect to existing gas piping for one (1) replacement gas-fired furnace to serve the 1st floor system as per plans. no change in use, egress or occupancy.
Connect to existing gas piping for new gas-fired furnace as per plans. remove existing gas-fired boiler. no change in use, egress or occupancy.
Connect to existing gas piping for new gas-fired furnace as per plans. remove existing gas-fired boiler. no change in use, egress or occupancy.
Reconnect gas piping for direct replacement of two (2) roof top package units and three (3) split hvac systems.
Reconnect gas piping for direct replacement of two (2) roof top package units and three (3) split hvac systems.