No public phone or license recorded on recent permits for this contractor. Permit history is listed below.
Interior Drain Tile System
Installation of Helical Piers to Rear and Right Foundation Walls.
Interior Drain Tile System.Rebuild Rear and Right CMU Foundation Walls.Installation of I-Beams to Front Foundation Wall.
Crawl Space Encapsulation.Replace in Kind Existing Wood Beam in Crawl Space.Jack and Shim Existing Columns in Crawl Space.
Installation of New Crawl Space door to Foundation Wall w/Shroud.
HISTORIC Interior Drain Tile System.
Installation of Push Piers to Right and Rear Foundation Walls.(Less than 50 sq. ft. Soil Disturbance)
Installation of a crawlspace access door in the front wall of the structure.
Underpinning existing crawl space/foundations to create a basement.-construct a new front areaway(under 50 square feet soil disturbance)-interior drain tile system
Interior Drain Tile System.
Installation of Stabilizer Posts w/Footings and Steel Beam in Crawl Space.Crawl Space Encapsulation.Interior Drain Tile System.
In the Georgetown Historic District In the Commission of Fine Arts jurisdiction area Installation of I-Beams and Carbon Fiber Straps to Interior Foundation Walls.Installation of In…