On the basement level convert commercial office into class a apt, remodel existing class a apt and create accessory laundry room. new co will be obtained.
Structural and foundation work in conjunction with on the basement level convert commercial office into class a apt, remodel existing class a apt and create accessory laundry room.…
Refile bis job # 140834649 remodel apt 3d on the second floor. no change in use, egress or occupancy.
Interior renovation of apt 3b on the third floor. no change in use, egress or occupancy.
Structural work type in conjunction with doc 1 to remove column dividing cellar entry door and widen existing doorway. no change to use, egress or occupancy.
Remove building entrance and vestibule doors and install new doors. Re-tile vestibule and lobby/public hall on cellar level. No change in use, egress or occupancy
Interior renovation of apt 3b on the second floor. no change in use, egress or occupancy.
Re-stain building entrance door, re-tile public hall and vestibule throughout, replace stone treads. nochange in use, egress or occupancy.