Herewith filing to propose general renovation , new gpy board, replace windows and all finishes as per plans - to existing 3 story 2 family dwelling w/ bsmt & cellar . no change in…
9th fl interior renovation: modification to ductwork and piping on partial 9th floor to accommodate the interior renovation in the existing building. no change to use, egress or oc…
Here with filing application to address ecb vio# project site39169469y & stop work order to repairfacade/exterior walls indicated as per plans.no change in use occupancy or egress…
Herewith to propose general construction , new gyp board, replace windows and all existing finishes to existing 2 family dwelling. no change in use, occupancy , or egress.
Reconfigure Class A unit at basement, rebuild existing bathroom at same location at first floor (Plumbing work under LAA), and remove SWO
Propose interior non structural demolition. no change in use, occupancy , egress or bulk to existing 3 story, 3 family
Here with filing application to remove illegal pl fixtures and partitions in cellar as per plans.no change in use occupancy or egress to existing 3 story, 3 family dwelling w/ cell…
Herewith filing to install construction fence as per plans.
Herewith filing mechanical work associated with residential building renovation and enlargement.
Proposed construction fence filed herewith in conjunction with nb job #321958841
Herewith filing construction fence as per plans in conjuction with dob job b01378308-i1
Herewith filing application to propose general construction/ renovation for 3 story 2 family dwelling; plumbing filed seperately under b01378308-s1. no change in egress or occupanc…
This application is being filed for temporary fence.
Renovation of existing retail store as per plans filed. No change in use occupancy or egress.
9th fl interior renovation: modification to interior partitions and finishes on partial 9th floor to accommodate the interior renovation in the existing building. no change to use,…
Herewith filing stuctural job as per plans to perform work in conjunction w/ b01009335-i1
Proposed earthwork and foundation at cellar level. - in conjunction with b01009335-i1 ( to address ecb# 39115768k)
Interior minor removals and renovations for suite 603 as per plans filed herewith. no change to use, egress or occupancy.
herewith filing construction fence as per plans in conjunction with job #B01289218-I1