two (2) new HVAC split system units on roof - heads in existing first floor commercial space
To replace vinyl siding with stucco at the rear portion of the building, concrete stairs with platform and restore wood vestibule enclosure and storage
To replace vinyl siding with stucco at the rear portion of the building, concrete stairs with platform and restore wood vestibule enclosure and storage
Interior renovation on existing 2 family to resolve ecb violations #39165146l;39165147n;39165145j. all as per plans filed herewith.
Interior renovation of existing 2 family to resolve ecb violations #3916229r and 39165230y all as per plans filed herewith.
Interior renovation of existing 2 family to resolve ecb violations #3916229r and 39165230y all as per plans filed herewith.
Gut rehab of existing restaurant space in frst floor to third floor as per plans filed. no change in use, egress or occupancy.
Application filed to restore existing accessory cellar to prior legal condition to resolve ecb violations all as per plans filed herewith.
Gut rehab of existing restaurant space in frst floor to third floor as per plans filed. no change in use, egress or occupancy.
Application filed to restore existing accessory cellar to prior legal condition to resolve ecb violations all as per plans filed herewith.
Installation of a temporary construction fence in conjunction with gc application #q00928662-i1 to resolve ecb violation #39528614n.
Renovation of existing apartment (3D) on the third floor
Installation of a temporary construction fence in conjunction with gc application #q00928662-i1 to resolve ecb violation #39528614n.
Interior renovation of existing restaurant all as per plans filed here with.
Interior renovation of existing restaurant all as per plans filed here with.
Interior renovation on existing 2 family to resolve ecb violations #39165146l;39165147n;39165145j. all as per plans filed herewith.
Interior renovation on existing 2 family to resolve ecb violations #39165146l;39165147n;39165145j. all as per plans filed herewith.
Installation of two min-split system (two condensers, three air-handlers) to address fdny violation 14184024j as per plans filed.no change in use, egress or occupancy.
Installation of two min-split system (two condensers, three air-handlers) to address fdny violation 14184024j as per plans filed.no change in use, egress or occupancy.
Minor partition alterations at interior of Basement apartment. Replace rear window. No change to Occupancy, Use, or Egress