Removal and installation of new sprinkler heads as per plans filed herewith. no change to use, egress or occupancy
Hereby filing to install sprinkler heads with related piping for new mechanical room as shown on plans filed herewith.
Filing herewith Sprinkler modification to the existing system as per plans. No change to use, egress or occupancy.
Sprinkler modifications as per plans filed herewith. No change in use, egress, or occupancy.
Sprinkler work on the 41st floor construction (42nd floor marketing) as indicated on drawings.
A wet pipe sprinkler system extending from the existing zone control in the stairwell at level 23 to provide proper coverage as required, in coordination with architectural layout.
Herewith filing for interior modifications to the existing sprinkler system in the subcellar #1 as per plans. no change to use occupany or egress under this application.
Rem: 2 sp heads, rel: 11 sp heads & install 6 new sp heads & piping on 1st floor. rem: 5 sp heads, rel: 20 sp heads & install 6 new sprinkler heads & piping on mezzanine level.
Modification to sprinkler system as per plans.
BMH SP Carrington Pav: Sprinkler modifications within the existing Hospital as per plans filed herewith. No change to zoning, use or egress
Modifications to the existing Sprinkler System: Remove (360) existing sprinkler heads and Install (654) new sprinkler heads and associated piping on the 8th Floor as per plans (Mor…
Sprinkler work on the 3rd floor as plans filed herewith. no change in use, egress, or occupancy.
Installation of new sprinkler heads and related piping. No change in use, egress or occupancy.
Hereby filing to remove and install sprinkler heads with related piping for office fitout as shown on plans filed herewith. No change to use, occupancy or egress.
hereby filing to remove and install sprinkler heads with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Sprinkler work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings.
Sprinkler work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.
Hereby filing to modify the standpipe and remove and install sprinkler heads with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or…
Additions/modifications to existing plumbing/sprinkler fixtures as per plans filed herewith.