No public phone or license recorded on recent permits for this contractor. Permit history is listed below.
2 Systems System #1: 9 supplies, 6 returns, supply/return trunk lines, Bath fan install, Fire radiant Damper, Kitchen exhaust rough in/final connect 300 CFM - Broan PM300SS, 4 gas…
2 gas lines - Main, Furnace, relocating A/C, Relocate Fresh Air Hood, 2 bath fan installs, supply/return trunks, supplies (10 main and lower level), returns (2) lower level, Lennox…
install heat pump mini split
install replacement boiler
install replacement furnace
install replacement boiler, bath fan
install replacement bath fan
install replacement boiler, dryer vent
gas line for range only
2 bath fan installs, 2 supplies, 2 returns
install bath fan
Kitchen exhaust rough in and final connection 300 CFM Broan PM300SS, 1 return and 1 supply
install replacement furnace, bath fan, dryer vent
install mini split
Floor supply on main floor
Gas line to dryer only
3 floor supplies and 5 gas lines (Main, Furnace, Range, Dryer, Water heater)
Gas line only to water heater(no hook up)