Installation of vrf hvac system and erv with all related ductwork and refrigerant piping to serve third floor. no change to use, egress or occupancy.
Application being filed to remove first floor rear apartment, deli store at first floor and walk-in box at cellar floor. also filing to resolve ecb violations 34660237n, 34660236l,…
Application being filed to build a boiler room at cellar floor, to renovate 1st floor store ug 6
Herewith file application to change use at 001 floor as per plans and obtain a new certificate of occupancy
Application being filed to address ecb violations #39155837l, #39155835h and #39155836j. also, filing to legalize awning at basement entry door, canopy above front porch at first f…
New roof bulkhead and new staircase. minor interior renovation.no change to use egress or occupancy.
Application being filed to remove dumb waiter and to refinish floor and ceiling in kind.
Install new distribution ductwork existing air handler and condenser to remain (package unit) No change to use , bulk or egress