Alteration application consists of New Rooftop Terrace as an accessory space for commercial office and new egress bulkhead. Additional work as shown on plans filed herewith.
Demolition and removal of ductwork as per plans filed herewith. No change in use, egress, occupancy.
Alterations of mechanical system on 15th floor as per plans. No change to use, egress or occupancy.
Structural framing for new slab openings, convenience stair, misc. MEP support, rooftop terrace and bulkheads.
Mechanical work as shown on plans filed herewith.
General construction for lobby renovations as shown on plans filed herewith. No change in use, egress, or occupancy.
Modifications to existing Mechanical Systems as per plans filed herewith. no change in use, egress or occupancy.
Demolition and general construction on 15th floor as per plans. No change to use, egress or occupancy.
Application filed for temporary interior renovation of non-load bearing partitions, ceilings, & finishes in the cellar and 1st fl to resolve ecb violations as per plans filed herew…
Work includes partial demolition of existing walls and finishes as shown on plans. New convenience stair (PDA00007812), restrooms, & finishes on 5-7TH for a single tenant. Glass en…
General construction including renovation of an existing accessory pantry located on accessory terrace. No change in use, egress, or occupancy.
Mechanical modifications to take place on the 20th floor as per plans filed herewith. No Change in use, egress, or occupancy.
Mechanical work on partial 22nd floor as per plans. No change to use, egress or occupancy.
Renovation work for 6th floor
Interior fit-out of the entire 5th floor including non-loadbearing partitions. The project includes offices, meeting rooms and support spaces. No change to use, egress or occupancy
Mechanical work in 31st floor as per plans. No change to use, egress or occupancy.